Kemsley Turbine Hall Boiler Dismantling
Econ tasked with carrying out the Dismantling and Decommissioning of a turbine hall.
Six specialist divisions working with the UK’s leading constructionand infrastructure companies. We enable safe, effective, andcompetitive solutions for a wide range of enabling works.
Econ tasked with carrying out the Dismantling and Decommissioning of a turbine hall.
Econ Group Carrying out Enabling works at Brighton Bus Garage
Our reactive maintenance team received a called early on Tuesday evening to attend a major incident on the A3 in Surrey
Econ Group undertook the role of principle contractor to carry out Asbestos Removal and Demolition of former swimming pool, Stores and plant room in an operational school campus.
Econ Group have been working on a project in Hastings, East Sussex over the past few months. The scheme of works is part of a large housing development for a national housing developer.
Econ Group were appointed to clear a former rail storage area. The job consisted of clearing 16 loads of fly tipped materials and levelling off the area to make safe for the site investigations.
Econ were called in to demolish the Holland Lane East road bridge, which passes over the railway tracks on the Oxted to Edenbridge line. Because of the need to minimise disruption to train services Econ were allowed a 52 hour window of access to the rail and road site and immediate surroundings.
Hotspray coating on Northumberland Park Railway Station
Econ were contracted to carry out a large scale demolition project at Savatorian College.
Econ were employed as a principle Contractor to plan, design and remove the canopy outside Woking Railway Station.
Econ were contracted to carry out the complete enabling works package at Tate & Lyle, we carried out all the design works, service isolations and diversion, all surveys including Ground Radar & Demolition Asbestos Surveys
Econ was commissioned to demolish and clear a concrete footbridge spanning a four lane highway. Timing was critical to ensure that disruption to traffic and local residents was kept to a minimum.
Our reactive maintenance team received a called early on Tuesday evening to attend a major incident on the A3 in Surrey
Econ Group have been working on a project in Hastings, East Sussex over the past few months. The scheme of works is part of a large housing development for a national housing developer.
Econ Group were appointed to remove large volumes of pigeon guano from an old building in North London. The premises had been empty for the last 25 to 30 years and now the owners are looking to transform the building into new social affordable housing.
Receive the latest news and updates from the Econ Group team
by signing up to our regular newsletters
Our Client is extremely pleased at the way we, supported by Econ, have dealt with the situation. From the moment you confirmed that notifiable asbestos was present, a focused, concerted effort has been made by Econ to deal with the problem. The client was impressed at the speed in which Econ tabled a strategic proposal to the HSE to remove the asbestos, working 24/7 non-stop, to expedite the removal. The fact that the proposal, including approval by the HSE, was achieved in such a short timescale is credit to Econ. The proactive approach, while being flexible and accommodating to allow key ECR staff to work in a safe, isolated contained area, has really impressed the Network Rail team.