Enabling

Completion

40+

Years in enabling works

0%

Tolerance to Waste

24/7

Reactive Team Maintenance

100%

Aiming for 100% Sustainability

Case Studies

Six specialist divisions working with the UK’s leading constructionand infrastructure companies. We enable safe, effective, andcompetitive solutions for a wide range of enabling works.

Pigeon Guano Removal – North London
Pigeon Guano Removal – North London

Econ Group were appointed to remove large volumes of pigeon guano from an old building in North London. The premises had been empty for the last 25 to 30 years and now the owners are looking to transform the building into new social affordable housing.

Reactive maintenance team in action
Reactive maintenance team in action

Our reactive maintenance team received a called early on Tuesday evening to attend a major incident on the A3 in Surrey

Econ’s Reactive Maintenance team in action
Econ’s Reactive Maintenance team in action

Econ’s Reactive Maintenance team in action

Warwick School Redhill
Warwick School Redhill

The second part of a two part project at Warwick School in Redhill.

Coram Fields
Coram Fields

Econ Construction undertook the role of principle contractor to carry out Asbestos Removal and Demolition of former swimming pool, Stores and plant room in an operational school campus.

Digging in the sand at Hastings!
Digging in the sand at Hastings!

Econ Group have been working on a project in Hastings, East Sussex over the past few months. The scheme of works is part of a large housing development for a national housing developer.

Deptford (Former Storage Compound)
Deptford (Former Storage Compound)

Econ Group were appointed to clear a former rail storage area. The job consisted of clearing 16 loads of fly tipped materials and levelling off the area to make safe for the site investigations.

Feltham Cycle Footbridge
Feltham Cycle Footbridge

Dismantling of existing cycle footbridge

HV Power
HV Power

Removal of redundant 66/33kVa transformers and associated plant from 4No sites.

Conway House
Conway House

Holland Lane East Bridge Demolition
Holland Lane East Bridge Demolition

Econ was called in to demolish the Holland Lane East road bridge, which passes over the railway tracks on the Oxted to Edenbridge line. Because of the need to minimise disruption to train services Econ were allowed a 52 hour window of access to the rail and road site and immediate surroundings.

Bush Road Bridge
Bush Road Bridge

Econ were contracted to demolish the double span brick arch bridge

Redundant Electrical Sub Station
Redundant Electrical Sub Station

Decommissioning of Redundant Electrical Sub-Station

Asbestos Cement Sheet Encapsulation
Asbestos Cement Sheet Encapsulation

Asbestos encapsulation using our coatings products.

Salvatorian College
Salvatorian College

Econ were contracted to carry out a large scale demolition project at Savatorian College.

Warwick School Redhill
Warwick School Redhill

The first of a two part project at Warwick School in Redhill.

Woking Station Canopy
Woking Station Canopy

Econ were employed as a principle Contractor to plan, design and remove the canopy outside Woking Railway Station.

Loaders Enabling Works, Silvertown
Loaders Enabling Works, Silvertown

Econ were contracted to carry out the complete enabling works package at Tate & Lyle, we carried out all the design works, service isolations and diversion, all surveys including Ground Radar & Demolition Asbestos Surveys

Licensable Asbestos Removal Toilet Block
Licensable Asbestos Removal Toilet Block

The Grove School
The Grove School

Large scale demolition of the Grove School covering 33,000m2.

TFL Rolling Stock
TFL Rolling Stock

Redundant rolling stock disposal and recycling

Bridge Demolition - Abbey Wood
Bridge Demolition - Abbey Wood

Econ was commissioned to demolish and clear a concrete footbridge spanning a four lane highway. Timing was critical to ensure that disruption to traffic and local residents was kept to a minimum.

Barking Riverside Extension Project
Barking Riverside Extension Project

Removal of Asbestos and Disposal of Redundant Rolling Stock

Preistmead School
Preistmead School

Asbestos removal and demolition of a 1930's school building in Harrow.

Reactive maintenance team in action
Reactive maintenance team in action

Our reactive maintenance team received a called early on Tuesday evening to attend a major incident on the A3 in Surrey

We've got news for you
subscribe for updates

Receive the latest news and updates from the Econ Group team
by signing up to our regular newsletters

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

“We were impressed with the approach used by you operation team to carry out the works both professional and diligently. Econ were very accommodating to meet our needs from the initial presentations prepared on strategy to mitigate risks and throughout execution of the works and keeping us fully informed and giving us the confidence we needed. The approach of Econ Site supervisors and visiting managers through to operatives on site was always of a high standard and good-natured and we are pleased to give credit where it is due. On site initiatives by the team from demonstrations /videos of emergency procedures when working in asbestos enclosures and working with consistent site uniforms contributed to the site achieving a Kier ‘Blue’ for best practice and working above standards. This was an excellent example of collaborative working and a joint approach to promptly overcome some of the challenges with asbestos and how best to deal with this along with working near challenging neighbours’ properties, the school and the church.”

Demolition and Asbestos Removal Sept 2023

Our Accreditations

Enabling
Teamwork
Enabling
Health & Safety
Enabling
Excellence
Enabling
Growth

Download our brochure

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.